How many images can your credits cover?
Calculate whole-image counts, remaining credits and mixed-resolution budgets from current per-image costs.
Separate balance from image count
2K uses 8 credits per image; 4K uses 18. Divide the balance by the per-image cost and round down. The remainder stays in the balance but may not cover another job. The table is calculated from current package credits and processing rates.
Budget mixed resolutions explicitly
For A images at 2K and B at 4K, budget A × 8 + B × 18 credits. Reserve credits for essential images before trying another tier for the same source. A 2K job followed by 4K is two separate successful jobs, not a discounted upgrade.
Distinguish failures, retries and downloads
Failed processing does not spend credits, and downloading does not spend additional processing credits. A completed image with an unwanted detail is still a successful job. A successful retry is charged separately. Review quality before repeatedly generating for extra sharpness.
Check current pricing and account terms
Processing uses paid plans. Registration or viewing examples does not imply a free enhancement allowance. Prices are in USD. Consult pricing and checkout for availability, subscription or one-time terms and balance rules. This is a usage calculation, not a promise of future rates.
| Credits | All used for 2K | All used for 4K |
|---|---|---|
| 100 | 12 images; 4 credits left | 5 images; 10 credits left |
| 500 | 62 images; 4 credits left | 27 images; 14 credits left |
| 2000 | 250 images; 0 credits left | 111 images; 2 credits left |
The columns are alternative uses of the same balance; do not add their counts together.
